Hydrogeological advisory, design and control of works.
Well construction for hydraulic barrier campaign, Alhué tailing dam
Project
An important Mining Company from the valley of Alhué river, in Melipilla Province, planned a well construction and pumping test campaign downstream the wall that holds its tailing dam.
Work Done
- Technical supervision and construction design along with pumping tests.
- Pumping test planning, water levels recording, pumping rates and physicochemical parameters measurement.
Results
For each well a construction and pumping test analysis report was handed, which were helpful as a technical record for the involved organisms to apply for a change in groundwater pumping points and the later hydraulic barrier startup.