Technical Work Control, Well Construction for Los Vilos’s Drinkable Water

Production System, La Serena and Ovalle.

 

untitled-design-28
untitled-design-27

Requirement

Aguas del Valle Company asked us for technical control of well construction works related to the construction of the Drinkable Water Production System at Los Vilos, La Serena and Ovalle.

Work Done

  • Technical control of the wells construction works.
  • Geological description of the drilled material.
  • Drilling parameters recording.
  • Well design approval.
  • Control and recording of well design, installation, gravel pack, well development and project completion.
  • Planning, supervision and analysis of executed pumping tests.

Results

Daily and weekly activities report were handed along with analysis and reports of contract increases or decreases. Also, final reports about well construction and pumping tests were made.