Well Design and Construction along with Pumping Tests Report in APR wells,

Chacabuco Province

 

untitled-design-23
untitled-design-24

Requirement

A water well drilling company asked us for technical advisory to elaborate well construction designing and final reports for the Rural Aggrupation´s drinkable water collections in Chacabuco Province.

Work Done

We took place on technical control of every construction stage of the groundwater collection, from the initial work installment until work finished.

Results

During the time that the advisory service was set all work was focalized into getting an efficient groundwater collection system with equipment, materials, working conditions, control, safety and environmental protection control.

The information we handed consisted in: photographic gathering, work installment report, equipment and drilling material status report, daily and weekly activities report, advance meetings record, revision ad approval of payment status, contract modification reports and final report of construction and pumping tests.

Aquist