Elaboration of Construction and Pumping tests reports
from wells Aires 5 and Algarrobal 6, Colina district


Requirements
A Drilling company asked us to elaborate a technical report of well construction and pumping tests of a groundwater collection system used to supply drinkable water to communities at Colina district.
Work Done
- Information of the constructed wells was gathered.
- Description of geological samples from the drilled material.
- A recording form was created to order drilling information and pumping tests.
- Hydraulic parameters calculation.
Results
A final report of each water collection was handed with all the information the DGA needs to submit a request and obtain groundwater rights.