A Drilling company asked us to elaborate a technical report of well construction and pumping tests of a groundwater collection system used to supply drinkable water to communities at Colina district.

Work Done

  • Information of the constructed wells was gathered.
  • Description of geological samples from the drilled material.
  • A recording form was created to order drilling information and pumping tests.
  • Hydraulic parameters calculation.

Results

A final report of each water collection was handed with all the information the DGA needs to submit a request and obtain groundwater rights.