Supervision of well construction and pumping tests, Las Rojas

drinkable water plant, Coquimbo region

 

5-recinto-agua-del-valle
collage-pozo-las-rojas-sanitaria

Project

Aguas del Valle, as an improvement stage for Las Rojas plant, performed the construction of 2 wells and Aquist was took part on their supervision process, both construction and pumping tests.

Work Done

The tasks performed consisted on the construction of 2 pumping wells and after that the execution of variable and constant rates pumping tests with the objective of knowing the aquifer and well response to the extraction of the required rates.

Advisory

Each step of construction, technical procedures, planning and analysis of pumping tests on wells counted with Aquist advisory and oversee.

Besides, respective reports were made for each well to hand this technical information to diligence and apply water rights with the DGA.